FMI Moly Plant Bulk Material Handling Feasibility Study
Main Areas include: Moly Concentrate Unloading, Sulfide Bagging, Metering and Feed, Moly Oxide Packaging, Storage and Retrieval
RMT Mobile Modular Gold Plant Project (20 TPH)
Process Design, GA’s, P&ID’s, & 3-D Modeling
SRP Coronado Generation Station
Detail Design of Limestone Handling Day Bin System Upgrades w/ Mech / Struct Upgrades
FMI Mill Secondary Crusher Feed Upgrades
Detail Redesign of Scalping Screen Disch Chutes, Feed Hoppers, Removable Walkway System, and Maintenance Platforms
FMI Concentrate Storage & Loadout Facility
Feasibility Study, GA’s, and Budget Cost Estimate
RMT Gold Plant Mill Additions
Preliminary design of new Mill, Modular Gold Plant, Dump Truck Unloading, and Equipment Layout
FMI NaHS Unloading & Storage Facility
Feasibility Study & Detail Design with PFD, P&ID’s, Pumping/Piping of Fluid Unloading/Storage Handling, Electrical, Controls and Capital Cost Estimate
FMI Molybdenum Sulfide Concentrating Plant
Feasibility Study & Preliminary Design, Evaluations, Design Criteria Development, PFD, P&ID’s, GA’s, Mech, Struct, Capital Cost Estimate (within 20%), Prelim Construction Schedule and Presentation to Corp Office
Tronox In-Situ H2S Generation Project
Process, P&ID’s, Piping, Mech, Struct, Elect, Programming and Commissioning, Cost Analysis and Project Scheduling
FMI Rhenium Expansion Project
PFD, P&ID’s, and As-Built GA’s of Plant Facilities
US Gypsum Dust Collection / Conveyor Additions – Turnkey, Detail Design and Construction of Dust Control Systems for Rail Car Unloading Facility, Plant Conveyors, and Storage Bins
Dryer Relocation Project
Mech GA’s, / Struct / Elect Design
City of Nogales Waste Water Grit Removal Project
Feasibility and Equipment Study & Selection, GA’s, and Capital Cost Estimate
Asarco Leach Enhancement Study
Study of New Plant Pumping / Piping facilities – PFD’s, P&ID’s, GA’s, Summary Evaluations, Capital Cost Estimate